Client: Shavello Developments

TRANSURBAN

Collins Square Level 30 & 31 Tower 5 Melbourne

SCOPE OF PROJECT – To manufacture an aluminum pond 16m x 3m in multiple sections to be able to be transported by elevator to the 30 & 31 floor of the building. To be able to be bolted together without welding on site to save time and effort .

This pond was also manufactured with a double tier so water could flow over the first tier into the base catchment below. The first tier was elevated to cater for this and had to be able to cover the weight of river rocks covering the bottom and the volume of water in the pond and be watertight after a membrane was laid down.

This project had a short deadline as it was running behind schedule.

Material used – 3mm and 6mm aluminum laser cut bent and welded .

The customer painted and installed the job.

Multiplex

Premier global construction company, Multiplex, has reached completion on the fifth and final commercial office tower at Walker Corporation’s landmark $2.5 billion Collins Square development located at 727 Collins Street in Melbourne’s CBD.

Collins Square is one of the largest commercial mixed-use developments in Australia. Spanning an entire city block, it consists of five commercial office buildings with retail space providing a combined total of more than 250,000 square metres of commercial space and 10,000 square meters of retail area.

The final $168.5 million tower spans 33-levels and reaches 117 metres in height. It provides a total area of approximately 40,000 square metres of commercial office space, and includes an integrated fit-out for the anchor tenant Transurban on Levels 24 – 31.