Client: Shavello Developments

TRANSURBAN

Collins Square Level 30 & 31 Tower 5 Melbourne

TRJ Engineering needed to manufacture this aluminum pond (16m x 3m) on a very short timeframe. In order to enable elevator transport to floors 30 and 31, we chose to fabricate the pond in multiple sections. The finished product includes a double tier, which enables water to flow over the first tier into the base catchment.

The project used the following materials: 3mm and 6mm aluminum (laser cut, bent and welded).